Bundle 02 of 03 · Zentry Sitewide+™

From the gate to GMP to project P&L. One platform.

Full-suite bundle economics, 35 to 45% TCO saving versus sum-of-parts.

All six modules in one platform. Built for regulated industrial plants of 1,000 to 5,000 workers facing real audit cycles (Schedule M, MSIHC, BRSR, IATF, OSH). One platform, one audit pack, one renewal. The bundle the audit-heavy plant actually needs.

ZENTRY SITEWIDE+Regulated plant · 6 modules
Audit-ready console · Pharma Plant B
PASSVisitors consented84 / 84
GATEContractors on-floor1,184
DRIVEVehicles matched44 / 44
INDUCTGMP certificates valid1,184 / 1,184
LEARNRole training current98.4%
WORKSHEETProject hours postedLive
SCHED MAudit pack readyYes
BRSROperational metricsLive
All 6 modules · one audit narrative
EXPORT FULL AUDIT PACK
Bundle · audit-ready
ModulesAll 6 (Pass + Gate + Drive + Induct + Learn + Worksheet)
Plant size1,000 to 5,000 workers
BuyerPlant Head + EHS Head + CFO + Procurement
DeployCloud / Hybrid Edge / On-Premise
What is inside this bundle

From the gate to GMP to project P&L. One platform.

Zentry Sitewide+ is the bundle for plants that face real audits. Pharma GMP units under Schedule M revised 2024. Chemical and petrochem MAH units under MSIHC and Section 41C. Listed manufacturers under SEBI BRSR. Tier-1 automotive suppliers under IATF 16949 customer surveillance. Plants where the audit pack is the operating reality, not an afterthought.

Sitewide+ extends the Sitewide perimeter (Pass + Gate + Drive) with the audit-grade modules: Induct (mandatory 3-minute kiosk induction with on-screen exam, MAH-built), Learn (role-based industrial LMS for BRSR records), and Worksheet (project P&L with gate-anchored hours for CFO and PMO heads). One event stream, six audit narratives, one platform.

What is inside Zentry Sitewide+:

  • Pass: industrial visitor management, DPDPA-compliant.
  • Gate: access + contractor attendance, Forms XIII to XXIII auto-generated.
  • Drive: vehicle, parking, ANPR + GST e-Way Bill match.
  • Induct: mandatory 3-minute kiosk safety induction, on-screen exam, certificate trail. Schedule M + MSIHC + §41B ready.
  • Learn: role-based industrial LMS, BRSR records, training matrix.
  • Worksheet: project + time intelligence, gate-anchored billable hours, project P&L, utilisation. For plant CFO, COO, PMO Heads.
  • Studio + Implementation + Care services wrapped in.
  • Cloud / Hybrid Edge / On-Premise deployment tiers.

Six modules. One platform. One audit pack. Audit-ready, not just digital.

Compliance coverage

Compliance coverage of the Sitewide+ bundle:

CLRA 1970

Forms XIII through XXIII auto-generated (Gate Muster view).

Schedule M 2024

Per-batch GMP contractor induction trail (Induct + Gate + Learn + Pass).

MSIHC 1989

MAH-unit hazard zone access ledger with induction certificate per zone (Pass + Induct + Gate).

Factories Act §41B / §41C

Mandatory induction certificate at entry + visitor + contractor evidence chain.

IATF 16949

Zone-level access logs + customer audit pack (Gate + Drive + Pass).

IS 14489 (OSH Audit Code)

Full visitor + contractor + vehicle + induction evidence for OSH audit.

SEBI BRSR

Training records, audit log, per-plant ESG-relevant operational metrics (Gate + Learn + Worksheet).

FSSAI Schedule 4

Visitor and contractor hygiene induction trail for food and FMCG plants.

DPDPA 2023

Explicit consent, India-resident storage, signed audit log.

GST e-Way Bill

Drive ANPR matched to e-Way Bill at the gate.

OSH Code 2020

Pan-India OSH evidence pack across all six modules.

Who buys this bundle

The heads behind the Zentry Sitewide+™ decision.

Plant Head / Site DirectorPlant Leadership

Pain: Audit cycles stack: Schedule M, IATF, BRSR, Labour Officer. Each audit needs different evidence from different systems. Audit prep becomes the plant's second job.

Zentry answer: One platform, six audit narratives, one operations console. Audit cycle prep time drops 70%+. Plant operations runs the plant, not the audit binder.

EHS Head / Safety ManagerEHS / Compliance

Pain: Contractor induction gaps. MAH-unit liability. Schedule M revised 2024 raised the documentation bar. Paper sign-off sheets no longer pass.

Zentry answer: Induct kiosk runs mandatory 3-minute induction with on-screen exam and certificate trail. Per-batch, per-zone, per-contractor evidence chain. EHS posture upgrades from defensive to demonstrable.

Plant CFO / Finance ControllerFinance / Project P&L

Pain: Project P&L is opaque. Billable hours are guessed. Multiple vendor renewals stack up. ROI of the gate stack is hard to defend.

Zentry answer: Worksheet ties project P&L to gate-anchored hours. CFO sees actual utilisation, actual billable, actual margin per project. One bundle renewal, transparent TCO, 35 to 45% saving versus sum-of-parts.

TCO and vendor consolidation

What Sitewide+ replaces, and what the TCO math looks like:

  • Visitor book + STK / DACS / BioTime + ARS + paper vehicle register: replaced by Pass + Gate + Drive (the Sitewide core).
  • Whiteboard induction, paper induction sign-off sheets, separate induction trainer agency: replaced by Induct kiosk + auto-certificate.
  • Excel-based training matrix, external LMS subscriptions, separate BRSR data collection: replaced by Learn.
  • Project P&L spreadsheets, Tally-only project tracking, manual billable reconciliation: replaced by Worksheet.
  • 6 separate vendor stacks, 6 AMC contracts, 6 audit narratives: replaced by 1 platform, 1 Care contract, 1 audit pack.
  • Typical TCO position: 35 to 45% saving versus the sum-of-parts of what a regulated plant currently runs.
Customer outcome

Anonymised composite story

6 systems to 1Vendor stack consolidation, before to after Sitewide+

Pre-Sitewide+, the integrated pharma plant in Hyderabad ran six separate systems: visitor book, biometric, vehicle register, whiteboard induction, external LMS subscription, and project P&L spreadsheets. Six vendors, six renewals, six audit narratives that did not reconcile. Post-Sitewide+, the plant runs one platform. Schedule M revised 2024 inspection closed in 90 minutes with zero documentation findings. AMC spend dropped 42%, audit prep time dropped 76%, BRSR data collection moved from a six-week annual scramble to a continuous live dashboard. Composite story drawn from real deployments. Industry, geography and metrics are representative.

All case studies
Ready to discuss Zentry Sitewide+™?

Book a 20-minute walkthrough.

We'll model the TCO and the audit posture against your specific plant footprint.

Zentry Sitewide+™ FAQ

Procurement and Plant Head questions, plainly answered.

Is Sitewide+ a re-deployment, or can we upgrade from Sitewide?

Upgrade, not re-deployment. Adding Induct, Learn and Worksheet on top of an existing Sitewide installation is a configuration change. Typical upgrade timeline is 3 to 4 weeks. No data migration, no gate downtime.

Does Sitewide+ require all six modules to be deployed at once?

Recommended yes, especially for regulated plants. The Sitewide+ economics and audit narrative depend on the full event stream. Plants can phase the rollout (Induct first, then Learn, then Worksheet) but the bundle pricing assumes full-suite deployment.

How does Sitewide+ handle Schedule M revised 2024 specifically?

Induct produces the per-batch contractor induction certificate. Gate ties the certificate to the actual on-floor presence. Learn handles role-based GMP training records. Pass handles visitor consent and PII for CDSCO inspection scrutiny. The Schedule M evidence chain is built into the bundle by design.

Is the TCO saving really 35 to 45%?

Composite of real deployments at regulated plants. The bigger the plant and the more audit cycles it faces, the larger the saving. Procurement teams can model this on your specific six-stack reality during qualification.

Can Sitewide+ handle a plant with 5,000+ workers?

Yes. The platform was architected for this scale. For plants beyond 5,000 workers, or for multi-plant Groups, Enterprise is the recommended bundle (Sitewide+ across 5+ plants with central console).

Does Sitewide+ work for plants under SEBI BRSR reporting?

Yes. Learn captures training records, Worksheet captures operational metrics, Gate captures contractor and worker hours. BRSR data collection moves from an annual scramble to a continuous live dashboard.

How does Sitewide+ help our CDSCO surveillance audit?

Surveillance inspectors land at the plant looking for the induction trail, the cleanroom access log, the personnel hygiene evidence and the GMP training records. Sitewide+ produces all four from a single signed event stream. Surveillance audits typically close in 90 minutes with zero documentation findings post-deployment.

What is the deployment timeline for Sitewide+ at a single plant?

Typical full Sitewide+ deployment goes live in 8 to 12 weeks per plant. Cloud is the fastest, Hybrid Edge adds 2 to 3 weeks, On-Premise adds 3 to 4 weeks for air-gapped commissioning. Phased rollouts can compress this if the audit cycle pressure demands it.

How it all connects

One event. Six audit narratives.

Every gate read, every kiosk submission, every certificate validation lands in a single tamper-evident, signed log. From that one event, six modules produce six distinct evidence trails, for six different audits, six different inspectors and six different heads inside the plant.